I woke-up yesterday afternoon in time to finish a backload and bring the boat back in.
The shrimping must be really good on the east side of the delta between Main Pass and Baptiste Collette. There sure were a lot of shrimp boats out there.
We took on a little more than 10 tons of fuel and 20 tons of potable water. Changed the oil and filters on the port generator. Just a moment ago I finished tightening-down the stuffing boxes on all four shafts, trying to find that elusive 3-second drip.
At about five minutes after midnight, the engineer offered to head downstairs to wake-up the deckhand. When I finally saw him, at about 00:30, I said: "Look, being late for your watch is a write-up offense. I don't want to write you up. So don't be late."
He looked confused, so I reiterated what I had said the first night we worked together.
"Your watch is midnight 'til noon. I expect to see you 10 or 15 minutes before your watch starts so I can let you know what we have going on, help you prioritize if we have an interruption, or whatever."
He looked more confused, then asked: "But what if I'm not awake 10 minutes before my watch?"
I have a feeling the second half of this hitch is going to be a long couple of weeks.
Showing posts with label deckhand. Show all posts
Showing posts with label deckhand. Show all posts
Friday, October 18, 2013
Wednesday, July 18, 2012
Projects
Just
lately we’ve been trying to knock out a few projects on the boat every day.
Today was spotlight day: the aft light was frozen in place, and the forward
light on the starboard side was dim and diffuse.
A
lot of elbow grease, some actual grease, a few power tools and a little
ingenuity later, Bill had the aft light operational.
My
job was easier – I just replaced the mirror and cleaned the inside of the
housing on the faltering forward light. While on top of the wheelhouse, I fixed
a broken antenna mount (we have 11 antennas atop the boat – but so far as we
can tell, only nine electronic appliances requiring antennas … guess we need to
trace those wires at some point) and began polishing our air horns.
I
replaced a couple of deck lights and we tested all the high-water alarms, as
well.
Yesterday
we tested all the engine alarms (oil pressure, gear lube pressure, water temp),
replaced two sending units and rewired one control box. We also made up two new
80-ft. mooring lines, spliced and whipped.
Meanwhile,
the deckhand on the night shift has been grinding and painting on deck – a
process I intend to continue on the next hitch, beginning at the top of the
mast.
Well
before we go to the shipyard for our Coast Guard hull inspection in November,
everything we can reach should be good to go. The shipyard will take care of
the hull – which badly needs a couple of fresh coats of paint.
A
lot of this is deferred maintenance, and some of it is just the sort of stuff
that we need to do periodically. One thing I’m sure of is that we’ll never run
out of things to do – this is, after all, a boat.