Showing posts with label shipyard. Show all posts
Showing posts with label shipyard. Show all posts

Friday, September 5, 2014

Three Plus Two Equals a Long Hitch (and other math)

Three weeks in shipyard, a few days floating around Fourchon, nearly two weeks on two different jobs.
I finally made crew change on the morning of Day 36 in Venice, the polyp on the rectum of the American Midwest.

It’s fun to poo-poo Venice (see what I did there?), but in truth it was sort of nice to be back.

When I got up for my first watch after we arrived, there on the boat sterning-up next to us at the back of Slip 2 was a fellow I had been in the DP Induction course with a few months back.

A boat I worked alongside last winter is still there, and I caught up over the radio with one of her captains. A boat working the same job we were on was captained by a mutual friend of several guys I’ve worked with in the past.

In Fourchon I got within waving (and photo) distance of NewEngland Waterman and enjoyed a quick visit with The Rocket Scientist. One night while running to a platform 70 miles offshore I crossed paths a good friend I’ve worked with at three different companies, starting back in the South Padre Island days.

Both he and another Texas captain stopped by to say howdy when we were in shipyard.

All of that got me to thinking about the “loose” connections some of us maintain out in the oil patch.

Those connections are useful in all kinds of ways; not least in alleviating the loneliness of those long stretches away from land and from home, but also in job leads and recommendations and in up-to-date local knowledge about passes or working channels.

Those loose connections also will get you a bag of sugar, a 12-pack of Dr. Pepper or a gallon of paint in a pinch.

It’s a commonplace that a sailor’s favorite ships are the last one and the next one. That said, I couldn’t be much happier with the boat and crew to which I was assigned.

Joining them in shipyard, well in advance of our various inspections, gave me the opportunity to spend some quality time with parts of the vessel I might not get around to messing with in weeks or months, normally.

It also gave me time to get to know my port captains, shipmates and safety guys, and to learn some of the paperwork routine before worrying about handling a more massive vessel with different propulsion than I’m used to.

I was nervous about that last thing: this is my first steel-hull vessel, and my first really big twin-screw vessel, and my first real DP boat. And before and after everything else, driving a boat (well) is what I get paid for.

Turns out that what friends who made that transition ahead of me said is true: workboats are easier than crewboats.

It’s different, for sure, but it’s mostly a process of subtraction: subtract two throttles, subtract about 3,000 horsepower, subtract a whole lot of maneuverability and responsiveness, subtract the expectation that you’ll get anywhere fast.


All of that math comes down to this: think ahead of the boat, not with it, and know that everything – including stopping – takes longer. Oh, and this: that bow thruster really isn’t optional in some situations.

The short week home has been all kids all the time, except for Wednesday, when The Old Lady and I attended Wednesday Night Church Services (aka, the Jon Dee Graham/James McMurtry double bill at the Continental Club in Austin).

I didn’t know how much I needed that until about the second verse of the first song.

I got to catch up a little with some folks I used to hang out with two or three nights a week. I was astonished to find out that the baby I knew one guy’s wife was expecting last we talked is now seven months old.

I was saddened to hear another friend’s mom died last week.

It was another reminder of the value of those loose connections, this time on land, where people I care about and with whom I have much in common but I too rarely see in person, also make me feel a little less lonely.

Wednesday, August 6, 2014

Some Days You're the Painter

And some days you're the paint. You just gotta roll with it either way.

I joined the new boat in shipyard: bottomside and classification society survey this week, followed by the topside (safety) inspection a couple more weeks down the road.

I was pretty thrilled that the shipyard guys sandblasted the hull and back deck and painted both for us.

I was less thrilled when they sandblasted the boat in dry dock right next to us immediately after pressure-washing our vessel mast-top to keel.

That's sort of the way it's been going: get the windows in the wheelhouse taped-up, then watch it rain for three hours. Start painting the wheelhouse, then quit and hope it sticks when a thunderstorm rolls in.

So it's good we have a little time. Apparently we'll need it.

Not least because there's ... well, there's a lot of paperwork with this company, and I'm still trying to wrap my head around the two daily reports, three weekly drills, the monthly and quarterly and 90-day (not the same thing as quarterly) drills, weekly trainers, the three separate monthly vessel condition reports, etc., etc.

The new boat is still under 100 GRT, though it's 170-ft. long. We operate with a five-man crew, which is better than the last crewboat's four, but probably not quite enough to comfortably handle all of the ISM paperwork we're required to do.

Still, great training for the next boat, which will (hopefully) be over 100 GRT.

This company's got them, which is one of the reasons I wanted to work here.

First impressions: good crew with the best kind of friendly, helpful and salty old captains; we don't have to twist anyone's arm to get the supplies we need (heck, we've had five mechanics on board the last week to completely rebuild our mains, generators and bow thruster -- and they're not even broken).

I feel a little like country mouse in the city, arriving on a steel hull from a crewboat. We have an icemaker. We have a pressure washer that is plumbed to fittings throughout the vessel. Our compressed air also is plumbed to fittings throughout the boat.

We have WiFi and satellite TV, and the company pays for it.

We have an honest-to-God satellite phone, and we can use it to call home when we're offshore.

So far, so good. I'm happy to be back at work.

Thursday, June 20, 2013

Shipyard

It’s been a quiet couple of weeks on this site. Not so much where I am.

Sandblasting, painting, welding, big wrenches banging around in the engine room … and every two hours or so an air-raid siren to mark breaks and the end of the work day.

We’re in shipyard for scheduled maintenance and our (bi-annual) hull and (annual) safety inspections.

Shipyard is exciting: we’ve gotten lots of things fixed, a few things upgraded, and even a couple of nice-to-haves.

Shipyard is tedious: everyone on the same watch, 0600-1800, and a fair amount of heavy lifting. Meals are catch-as-catch-can.

Shipyard is messy: lots of cleaning-up after mechanics, electricians and welders, not to mention the sand and dust and overspray.

Above all, shipyard in late June in southern Louisiana is H-O-T.

At least it’s not August.

One of the things I like about my current employer is that the office personnel generally seem to support the crews in doing the right thing when it comes to complying with MARPOL, Coast Guard and EPA regulations.

But out here in the oil patch you see a lot of stuff that is ... well, cringe-worthy. Sometimes it's laziness on the part of a crew or cheapness on part of a boat company or charterer. Sometimes it's just unavoidable.

Shipyard is a whole 'nuther thing, though. I suspect neither OSHA nor the EPA would be very pleased if they were to camp out here for a few days.

It was good to finally get back to the boat after an extra week off. The first five days we ran and ran, and then I brought the boat over to the Morgan City area from Fourchon.

With one spotlight down and one radar down, the trip up the Eugene Island Channel and through the Horseshoe was exciting, but not as much fun as the run up Bayou Chene, my first.

Anyhow, bottomside is done and new bottom paint is on.

Our topside inspection has been pushed back a couple of days while we wait for mechanics to finish on the boat.

We’re ready for the inspection now, and past ready to get back to work. Where that will be is anyone’s guess.

I’m keeping my fingers crossed for somewhere in Texas. Most of the other guys, not so much.