Showing posts with label crew boat. Show all posts
Showing posts with label crew boat. Show all posts

Thursday, June 20, 2013

Shipyard

It’s been a quiet couple of weeks on this site. Not so much where I am.

Sandblasting, painting, welding, big wrenches banging around in the engine room … and every two hours or so an air-raid siren to mark breaks and the end of the work day.

We’re in shipyard for scheduled maintenance and our (bi-annual) hull and (annual) safety inspections.

Shipyard is exciting: we’ve gotten lots of things fixed, a few things upgraded, and even a couple of nice-to-haves.

Shipyard is tedious: everyone on the same watch, 0600-1800, and a fair amount of heavy lifting. Meals are catch-as-catch-can.

Shipyard is messy: lots of cleaning-up after mechanics, electricians and welders, not to mention the sand and dust and overspray.

Above all, shipyard in late June in southern Louisiana is H-O-T.

At least it’s not August.

One of the things I like about my current employer is that the office personnel generally seem to support the crews in doing the right thing when it comes to complying with MARPOL, Coast Guard and EPA regulations.

But out here in the oil patch you see a lot of stuff that is ... well, cringe-worthy. Sometimes it's laziness on the part of a crew or cheapness on part of a boat company or charterer. Sometimes it's just unavoidable.

Shipyard is a whole 'nuther thing, though. I suspect neither OSHA nor the EPA would be very pleased if they were to camp out here for a few days.

It was good to finally get back to the boat after an extra week off. The first five days we ran and ran, and then I brought the boat over to the Morgan City area from Fourchon.

With one spotlight down and one radar down, the trip up the Eugene Island Channel and through the Horseshoe was exciting, but not as much fun as the run up Bayou Chene, my first.

Anyhow, bottomside is done and new bottom paint is on.

Our topside inspection has been pushed back a couple of days while we wait for mechanics to finish on the boat.

We’re ready for the inspection now, and past ready to get back to work. Where that will be is anyone’s guess.

I’m keeping my fingers crossed for somewhere in Texas. Most of the other guys, not so much.

Monday, May 13, 2013

Rolling, rolling, rolling ....


Coming into day seven of long, back-to-back runs. We’ve done a bit of everything: we have been to drilling rigs, lift boats and production platforms; pumped water and fuel, transferred cargo and personnel, even got a few hours of standby time in 200-feet of water.

During our offshore standby time the lead captain caught a tuna on the first drop, and that was lunch.

The weather has been all over the place, too, with a late-season cold front stalled over the area. Two nights in a row we had 40-knot winds, 5-to-7-foot seas, lightning and torrential rain. We even had hail, which makes quite a racket on an aluminum-hulled boat.

I’m also coming into day 27 of a 28-day hitch. I figured-out a while back that it’s not helpful to count the days ‘til the end, which now is nigh. Phew!

I could complain about my first hitch on this boat, but I’d have to make something up. The crew is still coming together, but the new first captain seems like a real good guy.

Back when we were still sitting at the dock a couple of days at a stretch, back in the good old days, we got some painting done on deck and have been tackling small repair and maintenance projects as we can. But mostly things are in good shape, and what’s not will be fixed when we go to shipyard in a month or so.

In the last week of running, I have been reminded of some of the unique privileges of this work. A new moon and a cloudless sky several nights have showcased the spangled vault above with the great, hazy wash of the Milky Way arcing overhead.

Our bow wave this past week has been a molten cascade of blue. It is the electric blue of lightning, the neon blue of sin, the plasma blue of a Star Trek warp drive.

On no more evidence than the color, I blame moderate densities of Noctiluca scintillans. The water is still cool enough for those bioluminescing dinoflagellates to be hanging around.

Anyhow, mesmerizing to watch, difficult to photograph.

Saturday, March 16, 2013

The Goddamned Coffeepot

The wind has finally laid down some, a real favor to this boat -- a "big 135" with a measly 2,800 horses and no thruster. Not that I've ever used a thruster on a crewboat, but still ...

This morning, at our fourth stop of the run, the first captain came storming up the wheelhouse stairs, shoved me out of the way and said: "I'm going to school you ..." I was, he said, making the deckhands uptight.

The indictment read as follows: throttle jockeying, rushing from rig to rig, dumping gears.

Hey, it's his boat and he has the right to insist it is run the way he wants it run. But I'm no throttle jockey. And I sure as hell wasn't throwing the sticks down on the dash with an audible "clack" as he demonstrated; I don't even hold the throttles in a way that would make that possible.

I may not be doing everything exactly the way he wants on this boat yet, but I sure wasn't doing everything wrong, which was his strong implication.

A little later, he rushed up the steps again.

"This is the second morning in a row the coffeepot hasn't been set up. On this boat, you have to set the coffee pot up for the next watch."

"Okay, I got that," I said.

"Well, why wasn't it done? This is the second time. It was set up for you!"

"Probably because I'm still drinking coffee, and it's not even 1100. You come on watch at noon, right? Also, I've been driving the boat for the last five hours."

"It's got to be set up when I wake up," he clarifies. "If I get up before [the engineer], if that coffee is more than 20 minutes old, I dump it out and make a fresh pot for him. We don't drink old coffee."

"Okay, [his name -- rhymes with "Dick"], so what time do you usually get up?"

"It depends, but usually by 8 or 8:30."

"Okay," I say. "I guess I'll stop drinking coffee by 0700, just to be safe, and make sure the pot is set up for you."

"Look," he says, voice rising, "That's just the way it is on this boat, the way it's been for the past 13 years. If you can't get with the program I'll throw the goddamned coffeepot overboard!"

Alrighty then.

Oddly, that's the longest exchange I've had with this guy. The other day, in an effort to make small talk, maybe find a connection, I asked: "So, what kind of bike do you have?"

I got a one-word reply: "Harley." Then he walked away.

I could have guessed that much, given that he was wearing a Harley t-shirt.

Does it matter? <shrug> I dunno. In the end I'm here for a paycheck, and for the sea time. I'm always hoping to learn something new and improve my skills. It would be really nice if my weeks on the boat also were pleasant, interesting, or even (from time to time) fun.

After the goddamned coffeepot conversation, I was ready to go.

"Man," I said to a friend, "this just isn't going to work."

I decided instead to sleep on it, and now I just don't know. We'll see how I feel come Tuesday, I guess.

Wednesday, November 7, 2012

Adapt and Overcome

Second day offshore of the final week of a hard five and the weather is beautiful. Early this morning we get the call to backload a crane part and head to an unmanned platform 20 miles distant – in another field altogether, as a matter of fact – and in water nearly 700 feet deep.

It’s directly on the other side of a busy shipping lane for vessels headed to the mouth of the Mississippi, and I got to make passing arrangements with a 600-foot tanker on the way out.

This particular unmanned platform is our customer’s most productive in the area and we carry equipment out there on average once a month.

The issue with the crane is a bad swing motor; we’re carrying the replacement, and meet half a dozen production operators who have flown out to the platform.

The first challenge is getting the boat positioned directly under the fast line so the lift can be picked-up while the crane is in its rest. There’s a pretty good current running into the jacket, but light wind and calm seas make that part of the operation pretty straightforward.

Until the operators discover the crane won’t start.

On Channel 10: “Hey Cap, y’all wouldn’t happen to have a 12-volt jumper box on the boat?”

“Yessir, we sure do. Do you have somewhere to plug it in?”

“No, we sure don’t. I guess we’d need a mighty long extension cord.”

I eyeball the distance from the deck to the crane pedestal. Less than a boat length, but not much. Maybe 100-120 feet. I consider how many extension cords we have on the boat.

“Well, I think  maybe we can make that.”

We cobble together four or five extension cords and send them up on a low-tech handline we tie to the handle of the jumper box.

A few minutes pass as I hold the boat directly below the crane, and simultaneously I hear a diesel engine roar to life and a ragged cheer go up from the cluster of men on the platform.

Success.

We offload the swing motor and set a course for our next stop, more than two hours away.

I am reminded of advice I once gave boaters in a hook-and-bullet magazine I then wrote for:
Carry jumper cables on your boat. Many otherwise fine fishing days have been ruined by a dead battery, and for some reason most boaters don’t carry jumper cables on board, even though they probably have them in their trucks.

This marks the first time I’ve every jump-started a crane from a boat, but apparently it’s not unheard of.

Telling our other captain about the morning’s fun when he comes on watch, he recalls the time he used an air compressor on deck to start a platform’s crane, 100 feet of air hose draped from the pedestal to the boat’s deck.

More than one hundred miles and many hours from shore-side support, we frequently have to find work-arounds for challenges that beg more perfect solutions.

Some challenges, of course, can’t be adequately met out here, and for that we have our scheduled shipyard time – scheduled, in this case, to coincide with our biannual USCG hull inspection.

Our office still hasn’t given us a date, but it pretty much has to be in the next two weeks since our COI expires Nov. 18. Our work list is already three pages long.