115: boats within a mile, per AIS.
17: boats in our slip right now.
19: cranes I can see from the wheelhouse. In the dark. And
not including any on boats.
49,000: feet of new wire and cabling required to convert a
172’ crewboat to DP-1.
26: days until crew change.
15-20: wind speed in knots, out of the south right now.
25-30: wind speed in knots, out of the northwest when the
front passes through shortly.
4-6: significant wave height in feet, out to 20 nautical miles.
2: number of mooring lines on the northwest side of the boat
after I doubled them up.
Congrats on the new position!
ReplyDeleteSounds like a good one,
ReplyDeleteIt will be a good one
ReplyDeleteWelcome to the wild west, hope to see you around the slip, we just got back in.
ReplyDelete